Research — Substation · Precomputed (draft, unvalidated)
Bus scheme and breaker count
One substation, six ways to arrange its buses and breakers. Pick a scheme, a circuit count and how many breakers are installed: the harness says how many that scheme calls for and whether you are short or over. Then break something. Click a breaker (out of service, fails to clear, or bypassed on a main-and-transfer scheme) or a bus, and everything the failure de-energizes goes dark, the open breakers snap open and the circuits that survive are counted. Cycle the scheme chips with the same breaker failed to compare.
Story
Free play · pick a scheme, then click any breaker or bus to fail it
Bus scheme
Circuits
Installed breakers · checked by the harness
When you click a breaker
Every control snaps to a value the harness was run at; the page reads that cell and never estimates between two. The stepper for installed breakers changes only the harness check. The diagram always shows the scheme’s own arrangement and never invents which breaker is missing.
Substation one-line · illustrative geometry, not a design
A circuit counts as energized when it is connected to a live source; a supply circuit also needs another circuit terminal in its component, so a source cut off from the station delivers nothing.
Circuits · which ones survive
Or fail an element from here
Breaker bay · installed against what the harness requires
One slot per breaker. The dashed tick marks the harness’s required count for this scheme and circuit count; a dashed slot is a breaker the count wants and the bay lacks, a red one is beyond it.
Compare the schemes · same circuit count, same failure
Every check at this state · the controlling row is highlighted
Rule column: the citation the data file gives for each check. The harness text for a violation or advisory is reproduced verbatim in the notes under the breaker bay.
How the checks read it
Every check · before, the step, the fix
The breaker count is the harness's result. Circuits still energized is demo logic from the exporter's graph walk, not a harness result. There is deliberately no whole-station verdict. Incomplete means the harness has no exact target and skipped the check: it is never a pass.
required_breaker_count, check_bus_configuration_breaker_count.Not modeled: real outage statistics or reliability, protection and relay coordination, breaker ratings, bus ratings and ampacity, fault current, maintenance switching sequences, transfer or paralleling logic beyond the generic arrangement drawn, double-failure (N-2) cases, and any real station layout. The drawing is schematic.See also:Bus scheme and breaker count, hands-off walkthrough · Station walk · Generation to rack: power path N-1