Research — Illustrative (draft, unvalidated)
Station walk
A generic 230 kV station, drawn to scale in plan and elevation. Seven checks run against it one at a time and the camera walks to each one: the fence, the lowest live part, the rigid bus phases, the bus over the station road, the horn-gap switch, and the breaker count for the bus scheme. Play six short stories, or switch to free play and drag the fence, the switch stand and the bus to exported stops.
Mode
Story plays a prepared change and its fix. Free play is yours: every control snaps to an exported stop.
Story
Elevation · side view, drawn to scale in feet
Plan · same x axis, top view
Breaker bay · installed against required
Walk to
Free play · drag the grips on the drawing, or use the stops
Each control sits on an exported stop; nothing between two stops exists in the file. The checks are independent, so a control changes only its own check (the insulation class changes five). Dragging the live-part grip in the plan moves the same gap as dragging the fence.
Check being read · click any row of the table to walk to it
Actual
Required
Margin
How the harness read it
All seven checks at this state · the controlling row is highlighted
The controlling row is the first failing check, else the first tight one. There is deliberately no single station verdict.
Regulatory-status note carried by the data (verbatim)
Every check · before the change, after the change, after the fix
A check reads "tight" when it passes with under 0.5 ft (6 in) of margin; that band is a display choice, not a code term. "Incomplete" means the dimension has not been entered, never a pass. The roadway card reads "n/a" when the scene has no road: that is scene state, not a harness result.
check_substation_fence_height, check_substation_fence_clearance, check_substation_equipment_ground_clearance, check_substation_rigid_bus_phase_spacing, check_substation_roadway_overhead_clearance, check_substation_horn_gap_switch_spacing, check_bus_configuration_breaker_count, validate_substation.Not modeled: the other substation checks (grounding, transformer spacing, lightning shielding, oil containment and more), other fence exceptions, jurisdiction overrides of the NESC edition, and any real site data. The 2007-to-2023 NESC revision of the cited tables has not been ruled out, and whether the ANSI/NEMA Table 4-7 and 4-8 values fit the NESC-edition adoption model is an open question (the note is reproduced below).See also:Station walk, auto · Fence clearance (single check)