Research — Auto walkthrough (draft, unvalidated)
Station walk, auto
Sit back and watch a generic 230 kV station get checked. A compliant station is measured one group at a time, then five changes each break a check and get fixed: a higher insulation class pushes the fence out, a low stand is raised, a new road forces the bus up, and a new bus scheme needs more breakers. Pause any time or pick a story.
Story
Elevation · side view, drawn to scale in feet
Plan · same x axis, top view
Breaker bay · installed against required
Check being read
Actual
Required
Margin
How the harness read it
All seven checks at this step · the controlling row is highlighted
The controlling row is the first failing check, else the first tight one. There is deliberately no single station verdict.
Regulatory-status note carried by the data (verbatim)
Every check · before the change, after the change, after the fix
A check reads "tight" when it passes with under 0.5 ft (6 in) of margin; that band is a display choice, not a code term. "Incomplete" means the dimension has not been entered, never a pass. The roadway card reads "n/a" when the scene has no road: that is scene state, not a harness result.
check_substation_fence_height, check_substation_fence_clearance, check_substation_equipment_ground_clearance, check_substation_rigid_bus_phase_spacing, check_substation_roadway_overhead_clearance, check_substation_horn_gap_switch_spacing, check_bus_configuration_breaker_count, validate_substation.Not modeled: the other substation checks (grounding, transformer spacing, lightning shielding, oil containment and more), other fence exceptions, jurisdiction overrides of the NESC edition, and any real site data. The 2007-to-2023 NESC revision of the cited tables has not been ruled out, and whether the ANSI/NEMA Table 4-7 and 4-8 values fit the NESC-edition adoption model is an open question (the note is reproduced below).See also:Station walk, interactive · Fence clearance, auto sweep