Research — Generation · Precomputed (draft, unvalidated)
Fast-track screens walk
A generic feeder: a substation, a protective device, a line section with loads, a distributed generator already connected, and a new request. Six interconnection screens act as ordered gates: 15% of peak load, 10% fault-current contribution, 87.5% of the device's interrupting rating, a 20 kW shared-secondary limit, a 240 V service imbalance limit and a 10 MW transient-stability limit. The first one that fails lights up on the feeder and on its gate. Play six short stories, or switch to free play and drag the request along the load bar.
Mode
Story plays a prepared request and its fix. Free play is yours: every control snaps to an exported value.
Story
Free play · set a request, then watch the screens run in order
Request size · new DER (or drag the grip on the load bar)
Line-section peak load
Existing DER on the line section
Service type
Single-phase request
Other generation on the same secondary
Service transformer rated current
Resulting 240 V imbalance
Area · transient stability
10 MW screen · new DER
10 MW screen · existing DER
Every control sits on a value the harness was run at; the page looks that cell up and never estimates between two. The three feeder screens come from one grid (three-phase feeder, 4000 A utility-side fault current, device rated 4900 A). The 20 kW, 240 V and 10 MW screens come from their own tables. Arrow widths in free play are a drawing scale only: no amp figure is printed that is not in a cell.
Single-phase service is a different scene: its few-kW units have no cell in the three-phase feeder grid, so those three screens read "not exported" rather than guessing.
Feeder plan · the request walks six ordered screens, the first failure lights up
Walk result
Screen being read · click a gate on the drawing or a row below to read it
Actual
Required
Margin
How the harness read it · its own words, verbatim
All six screens at this state · the controlling row is the first failing screen
Walk order is SGIP numbering order. The highlighted row is the composite's first failing screen; when none fails, nothing is highlighted and there is deliberately no overall verdict. Click a row to read that screen.
Notes the harness attaches to every result · shown even when everything passes
Every screen · before the request, with the request, after the fix
Required values are read from the data file. 'Incomplete' means an input is missing and the check did not run, never a pass. 'Not applicable' means the screen's scope precondition is not met (the 20 kW and 240 V screens are not called for three-phase service; that gating is the demo's scene logic and is tagged).
check_der_fast_track_15_percent_screen, check_der_fault_current_contribution_10_percent_screen, check_der_short_circuit_interrupting_capacity_87_5_percent_screen, check_der_single_phase_shared_secondary_20kw_screen, check_der_240v_service_imbalance_screen, check_der_transient_stability_10mw_screen, run_fast_track_screens.Not modeled: the rest of Fast Track (size and voltage eligibility, the other 2.2.1 screens, the supplemental review), a jurisdiction override of any percentage (three states codify different ones), study-grade fault-current modelling (the DER amps are a demo pairing), and any real feeder. The drawing is schematic: positions, device and DER symbols are illustrative.See also:Fast-track screens walk, hands-off · Ride-through zones · Cease-to-energize