Research — Auto Demo · Precomputed (draft, unvalidated)
Fast-track screens walk — auto
No controls here: six short stories play on their own. A request on a feeder passes the screens that can run; then a bigger one fails the 15% screen, the 10% fault-current screen, the 87.5% interrupting screen, and the single-phase screens in turn. Each failing screen lights up on the feeder and its gate, and each fix (a re-measured peak load, a retired unit, a higher-rated device, a smaller request) is shown. Use Pause, or the story and step buttons, to stop on any frame.
Story
Feeder plan · the request walks six ordered screens, the first failure lights up
Walk result
Screen being read · click a gate on the drawing or a row below to read it
Actual
Required
Margin
How the harness read it · its own words, verbatim
All six screens at this step · the controlling row is the first failing screen
Walk order is SGIP numbering order. The highlighted row is the composite's first failing screen; when none fails, nothing is highlighted and there is deliberately no overall verdict.
Notes the harness attaches to every result · shown even when everything passes
Every screen · before the request, with the request, after the fix
Required values are read from the data file. 'Incomplete' means an input is missing and the check did not run, never a pass. 'Not applicable' means the screen's scope precondition is not met (the 20 kW and 240 V screens are not called for three-phase service; that gating is the demo's scene logic and is tagged).
check_der_fast_track_15_percent_screen, check_der_fault_current_contribution_10_percent_screen, check_der_short_circuit_interrupting_capacity_87_5_percent_screen, check_der_single_phase_shared_secondary_20kw_screen, check_der_240v_service_imbalance_screen, check_der_transient_stability_10mw_screen, run_fast_track_screens.Not modeled: the rest of Fast Track (size and voltage eligibility, the other 2.2.1 screens, the supplemental review), a jurisdiction override of any percentage (three states codify different ones), study-grade fault-current modelling (the DER amps are a demo pairing), and any real feeder. The drawing is schematic.See also:Fast-track screens walk, interactive with free play · Ride-through zones, auto